The following list includes acronyms used on system level and shall be common to all documents.
...
Meaning | Explanation | Used in / Link | |
---|---|---|---|
A | |||
ANDES | ArmazoNes high Dispersion Echelle Spectrograph | ||
AD | Applicable Document | Legally binding documents and reports | |
ADC | Atmospheric Dispersion Corrector | ||
AIT | Assembly, Integration and Test | In ESO terminology this is the phase in Europe that ends with the PAE (more general, should be MAIT) | |
AIV | Assembly, Integration and Verification | In ESO terminology this is the phase in Chile that ends with the PAC | |
AO | Adaptive Optics | ||
ANDES | ArmazoNes high Dispersion Echelle Spectrograph | Name of the instrument | All documents |
arcsec | Arc Second | ||
B | |||
BOL | Beginning of Life | ESO | |
C | |||
CCD | Charged Coupled Device | Area detectors | |
CCF | Camera Control Framework | ||
CCS | Central Control System | ||
CIDL | Configuration Item Data List | ||
CM | Configuration Manager | ||
CND | Control Non Deterministic | ||
CoC | Certificate of Conformity | Management Plan | |
COTS | Components of the shelf | Non-costumized products | |
CoG | Center of Gravity | ||
CoM | Center of Mass | ||
CR | Coudé-room | Part of the ELT | ESO |
CU | Calibration Unit | Subcomponent | |
CD | Coudé Distributor | ||
CDET | Control Deterministic | ||
D | |||
DAS | Data Analysis Software | ||
DCS | Detector Control System | ||
DDV | Design, Development and Verification Plan | ||
DET | Detector | ||
DF | DarkFiber | ||
DPM | Data Product Manager | ||
DRS | Data Reduction Software | ||
DM | Deformable Mirror | ||
E | |||
EB | Executive Board | Management | |
EFL | Effective Focal Length | the distance from the principal point to the focal point | |
EH | Entrance Hall | ||
ELT | Extremely Large Telescope | ||
ESO | European Southern Observatory | ||
ETRS | Element Technical Requirement Specifications | ||
F | |||
F2F | Fiber-To-Fiber link | In-fiber connection point | |
FAC | Final Acceptance Chile | ESO | |
FCS | Function Control System | ||
FDR | Final Design Review | Milestone of the project, controlled by ESO | ESO |
FE I-IV | Front End I-IV | Pickup of the beam coming from the telescope. | |
FFS | Flat-Field Sources | Calibration Sources used for Flat-Fielding | CU |
FL-IFU | Fiber Link - Integral Field Unit | ||
FMECA | Failure Mode, Effects, and Criticality Analysis | ||
FoV | Field of View | ||
FP | Fabry-Pérot | Etalon, Interferometer, Resonator in Literature | |
FR | Funding Review | ESO | |
FSR | Free Spectral Range | Spectral range between two spectral features | |
FTE | Full Time Equivalent | see below | |
FTS | Fourier-Transform Spectrograph | ||
G | |||
GigE | GigE connection | ||
Gly | Glycol | ||
GPS | Global Positioning System | ||
GUI | Graphical User Interface | ||
GN2 | Gaseous Nitrogen | ||
GTO | Guaranteed Time Observations | ||
GUI | Graphical User Interface | ||
H | |||
HCL | Hollow-Cathode Lamps | Wavelength calibration lamps | CU |
HIRES | High Resolution Spectrograph | Outdated name of the instrument /project -> ANDES | |
HE | Helium | ||
HRT | Hard Real-Time | ||
I | |||
IAA | Instrument Assembly Area at Armazones | ||
ICD | Interface Control Document | ESO-Standard, that is used to define Interfaces and their Responsibility | |
ICS | Instrument Control System | ||
IF | Interfaces | ||
IFW | Instrument Framework | ||
IFU | Integral Field Unit | ||
ILS | Instrumental Line Shape | See Definitions below | |
IP | Instrumental Profile | see also linespread function or ILS | |
IR | Infrared | ||
IS | Instrument Scientist | ||
IFU | Integral Field Unit | ||
IFW | Instrument Framework | ||
IS | Instrument Scientist | ||
J | |||
K | |||
L | |||
LCS | Local Control System | ||
LCU | Local Control Unit | ||
LDP | Light Distribution Point | Connects, switches light sources to the OUP of the CU | |
LG | Laser Guide | Conflict with Light Guiding CU subsystem | |
LGS | Laser Guide Star | ||
LLI | Long Lead Item | ||
LN2 | Liquid nitrogen | ||
LUT | Look-Up table | ||
M | |||
mas | Milli-arcseconds | ||
MAIT | Manufacturing, Assembly, Integration and Test | ||
MBSE | Model Base System Engineering | ||
MS | Main Structure | WP that provides interfaces of subunits with environment | CU |
MTBF | Mean Time Between Failure | ||
N | |||
NCR | No-Collapse Requirement | Where is used this? | |
NCR | Non-Conformance Report | Used in the subsystem-reviews. Is this ESO-standard? | |
ND | Nasmyth Distributor | ||
NGS | Natural Guide Star | ||
NI_CR | Network Infrastructure Computer Room | ||
NIR | Near Infrared | ||
O | |||
OBS | Organization Breakdown Structure | ||
OCS | Observation Coordination System | ||
OM | Observing Mode | ||
OUP | Output Port | Fiber ports used in the CU → Optical Interface to the Fiber WP | |
P | |||
PA | Product Assurance | ||
PAC | Preliminary Acceptance Chile | ||
PAE | Preliminary Acceptance Europe | ESO-controlled milestone of the project | |
PBS | Product Breakdown Structure | ||
PCF | Photonic Crystall Fibre | Used in the Astrocomb for spectral broadening | |
PD | Photodiode | ||
PDR | Preliminary Design Review | ESO-controlled milestone of the project | |
PHL | Preliminary Hazard List | ||
PI | Principal Investigator | ||
PLC | Programmable Logic Controller | ||
PFS | PreFocal Station | ||
PM | Project Manager | ||
PO | Project Office | ||
PS | Project Scientist | ||
PT | Product Tree | ||
PTV | Peak To Valley | ||
Q | |||
QA | Quality Assurance | ||
R | |||
RBM | Rigid Body Motion | ||
RCR | Review Conclusion Report | ||
RD | Reference Documents | background references only. | |
RFW | Request for Waiver | To waive a requirement | |
rms | Root Mean Square | A statistical Value, see below | |
RP | Resolving Power | lambda/deltaLambda | |
RTC | Real Time Control | ||
S | |||
SA | System Architect | ||
SAR | System Architecture Review | ||
SC | Steering Committee | ||
SCAO | Single Conjugate Adaptive Optics | ||
SCS | Spectral Calibration Sources | Light sources providing spectral information that can be used for calibration. | CU |
SCP | Service Connection Point | ||
SCP_C | SCP Coudé | ||
SCP_CR | SCP Computer Room | ||
SCP_N | SCP Nasmyth | ||
SE | Systems Engineer | ||
SoW | Statement of Work | ||
SR | Strehl Ratio | measure of the quality of optical image formation | |
SRT | Soft Real-Time | ||
SSE | Software System Engineer | ||
ssSE | Sub-System Engineer | ||
ss (PT) | subsystem(s) (Project Team) | can be used as singular or plural | |
SOW | Statement of Work | ||
ST | Science Team | ||
SW | Software | ||
SWSE | SoftWare-System-Engineer | ||
T | |||
TBC | To be Confirmed | ||
TBD | To be Defined (frequently To be Discussed) | ||
TCCD | Technical CCD | ||
TLR | Top Level Requirement | ||
TRL | Technical Readiness Level | see definitions | |
TRS | Technical Requirements Specification | ||
TRES | Time Reference System | ||
TSE | Thermal Self Emission | ||
U | |||
US | UBV Spectrograph | ||
V | |||
VIS | Visible Range of Light | (400 nm - 700 nm as defined by ISO Standards) | |
W | |||
WBS | Work Breakdown Structure | ||
WCS | World Coordinate System | ||
WFS | WaveFront Sensor | ||
WFRTC | Wave-Front Real-Time Computer | ||
WG | Working Group | ||
WLM | Wavelength Marker | frequency-stabilized Lasers, used in the CU to anchor the wavelength solution | |
WP | Work Package | ||
WPM | Work Package Manager | ||
X | |||
Y | |||
YS | YJH Spectrograph | ||
Z | |||